Power BI

How to Choose a Power BI Consultancy: Criteria and Questions to Ask

Nine criteria to evaluate a Power BI consultancy, the warning signs in proposals and the questions to ask in the first meeting.

Published 7 min readOriginally published in Portuguese on
In this article
  1. Before comparing consultancies, define the problem
  2. The nine criteria that matter
  3. Warning signs in proposals
  4. Questions to ask in the first meeting
  5. Consultancy, freelancer or in-house team?
  6. How Active BI works
  7. Frequently asked questions

Before comparing consultancies, define the problem

The same consultancy can be excellent for one scenario and a poor fit for another. Before the first meeting, it helps to know which of these you are in:

  • A new implementation. The company still decides by spreadsheet and wants to build BI from scratch. The risk sits in the data foundation and the modeling.
  • An existing environment that does not deliver. There are reports, but the numbers do not match, refreshes fail or nobody knows who maintains what. Here the starting point is a diagnostic, not a new report.
  • Scale and governance. Power BI worked in one department and has to reach the whole company with security, standards and license cost under control.
  • Reports for people outside the company. Customers, partners or franchisees need to see the numbers. The topic becomes Power BI Embedded, a portal and per-user security.

With the scenario clear, it is easy to tell whether a consultancy is answering your problem or giving everyone the same pitch.

The nine criteria that matter

1. Depth in data modeling

What holds a reliable Power BI together is the semantic model: tables, relationships, measures and business rules defined once. Ask the consultancy to explain how it would model one of your metrics, such as net revenue. If the conversation stays on visuals and colors, the risk is beautiful reports with numbers that disagree with each other.

2. Integration with the ERP and other sources

In most mid-sized and large companies, data comes from SAP, TOTVS, a CRM and spreadsheets. Poor integration can slow the ERP during business hours or breach the system's licensing. Ask how extraction is planned source by source and who validates that the report number matches the ERP. When the project involves several sources, the consultancy needs real data engineering, not just connectors.

3. Governance from the start

Workspaces organized by department, row-level security (RLS), certified datasets, development and production environments, and rules on who publishes what. Without these, the environment grows in a disorderly way within a few months.

4. Command of licensing

The choice between Power BI Pro, Premium Per User and Microsoft Fabric capacity changes the annual cost significantly, especially when many people only view reports. A good consultancy runs this calculation before proposing the architecture.

5. A team, not one person

A project that depends on a single consultant stops when that person goes on vacation or leaves. Ask who takes part in the project besides the developer: a business analyst, a project manager, UX. And ask what happens if someone on the team leaves midway.

6. Transparency during the project

You should know, without asking, what was done, by whom and in how much time. Incremental deliveries every few weeks and visible hours are the best antidote to the project that disappears for three months and comes back late.

7. Proof you can verify

Case studies that name the client, signed technical capability statements and references you can talk to are worth more than any number on a website. Be wary of anyone who shows only logos with no project described.

8. Documentation and continuity

The model, the measures and the rules must be documented and stay with your company. Ask how knowledge is handed over to your team and how support works after delivery.

9. Business vision

BI exists to support decisions. The consultancy's team has to be able to talk to the CFO about margin and closing, not only to IT about gateways and refreshes.

Warning signs in proposals

SignWhy it matters
Priced per report, without looking at the sourcesThe real cost is in integration and modeling, not the screen
No stage to gather the metricsWithout defined rules, every report calculates differently
A one-week timeline for everything, or a year with no deliveriesBoth extremes point to a misunderstood scope
Nothing about governance, security or licensingThe problems show up later, when the environment grows
No documentation plannedThe company becomes dependent on whoever built it

Questions to ask in the first meeting

  1. How would you define and validate our main metrics?
  2. How do you plan to extract data from our ERP without affecting operations?
  3. Who will be on the project team and what is each person's role?
  4. How will I track hours and deliveries during the project?
  5. Which licensing makes sense for our number of users, and why?
  6. How will governance work: workspaces, row-level security and publishing?
  7. What gets documented, and who keeps the model at the end?
  8. Can I talk to a client of a size similar to ours?
  9. What is the first valuable deliverable and how soon does it arrive?

Consultancy, freelancer or in-house team?

An independent professional handles well-defined, one-off requests. An in-house team is the best path when BI becomes a daily routine and there is enough volume to justify hiring. A consultancy makes the most sense when the project involves several sources, governance and a deadline, or when the internal team needs method and reinforcement to unblock the environment. Many companies combine the two: the consultancy structures and the internal team operates.

How Active BI works

Active BI's BI and Power BI consulting serves mid-sized and large companies with a full squad: a Power BI specialist, a business analyst, a project manager and UX/UI. Hours and deliveries are visible in the Client Portal during the project. That comes to more than 150,000 hours in Power BI projects and more than 100 technical capability statements signed by clients, for companies such as Lenovo, Motorola and State Grid. When the environment already exists and does not deliver, the path usually starts with a Power BI diagnostic.

If you are comparing vendors, it is also worth reading our comparison of BI consultancies in Brazil and the guide on how much Power BI consulting costs.

Frequently asked questions

How soon should a Power BI consultancy deliver something useful?

First deliveries of value within 4 to 8 weeks are a healthy standard. The rest of the roadmap should arrive in incremental deliveries, each one validated with the business areas.

Does it matter if the consultancy is a Microsoft partner?

It helps, because it signals direct contact with the vendor and access to resources and updates. But it does not replace practical proof: case studies, capability statements and references say more about delivery quality than a badge does.

Does the consultancy need to know my ERP?

It needs to know how to extract and model data from it safely. With SAP and TOTVS, this makes a difference in system performance and licensing.

Can I hire just a diagnostic before the project?

You can, and in existing environments it is the safest path. The diagnostic shows what is holding the environment back and a prioritized roadmap before any bigger decision.

Next step

For a first conversation about your scenario, talk to an Active BI specialist.

Luiz Souza

Written by

Founder and CEO of Active BI

Share

Need a team behind your Power BI?Development, governance, support and licensing with the same team.